Optimized Conductor Positioning for Three-Phase Double-Circuit Transmission Line to Reduce Line Capacitance
Date Issued
2024-01-01
Author(s)
Shah, Dhruv
Kumar, Nishant
DOI
10.1109/ICPC2T60072.2024.10474665
Abstract
Multistart techniques are very useful in solving global optimization problems. Different algorithms and tools have evolved from the multistart approach to find optimal solutions to non-linear programming (NLP) problems. A modified version of the global search (MGS) toolbox is proposed here. MGS is applied to optimally reduce the capacitance of the transmission line. The algorithm is tested with three-phase double-circuit transmission lines with different voltage ratings, like 66 k V, 110 k V, etc.